Asked how long a commercial takes, most people want a single number back. The number is the least useful part of the answer, because a delivery date is not a duration. It is a sequence, and most of the sequence happens before a camera is switched on.

Pre-production is where the date is won or lost

A script that is still moving cannot be scheduled. Everything downstream is derived from it: the boards, the casting brief, the recce, the kit list, the wardrobe, the props, the sound plan, the permits. Change a line and part of that has to be redone. Change the premise and all of it does. This is why a producer pushes for a lock date and then defends it, and why "we are still discussing the ending" is a scheduling problem before it is a creative one.

The technical recce is the highest-leverage hour in the whole production. Walking the space with the director of photography and the gaffer converts a plan into a shot order, and it is where the shot nobody could have lit gets discovered while there is still time to solve it.

The shoot day is the least elastic part

A shoot day cannot be extended by asking for it. Talent hours are contracted, daylight is finite, and every company move takes a block out of the middle of the day. What actually governs the day is the number of setups — each one a lighting state, a camera position and a lens — and setups are the unit worth arguing about in advance. A shot list that quietly implies twice the setups the day was planned for will not fit, and the discovery always happens at the worst possible hour.

Perspective slot — awaiting Ashraf's own words on how a production week is actually run, and what a client should hear on each day of it.

Post is a chain, not a bucket

On a timeline, "post-production" is usually drawn as one bar. In practice it is an ordered chain in which each link waits for the one before it:

  • Assembly, then an offline cut, while structure is still arguable.
  • Notes rounds — in Frame.io, timecoded on the frame, rather than paraphrased in an email thread.
  • Picture lock. Everything after this becomes harder and slower to change, because sound, grade and titles are all built on the locked length.
  • Conform, then the grade in DaVinci Resolve on a calibrated display.
  • Sound: the mix, the voiceover, music clearance, and the loudness standard the broadcaster requires.
  • Titles, legal lines and any market-specific supers.
  • Versioning: the broadcast master, the cutdowns, the vertical and square recomposes, subtitle files per market.

Versioning is the step that surprises people. It is not a render, it is a re-edit: a wide frame recomposed to vertical needs different framing decisions and often a different cutting rhythm. Deciding the version list before the shoot is what keeps it a recompose instead of a second production.

Ask for gates, not a duration

The two decisions that move a delivery date most are when the script locks and how many rounds of notes exist. So a schedule worth signing names them both: the lock date, the date each round of notes is due back, who is entitled to give them, and what moves if they arrive late.

A schedule with named gates survives contact with a real week. A schedule that is one arrow labelled "production" does not. A date is a promise about a sequence — so ask what the sequence is.

Enjoying this article?

Get more insights like this delivered monthly.